East Road, East Wall: sold prices
There are 14 recorded sales on East Road since 2010. Homes have sold for a median of €344,000 since January 2023, across 2 open-market sales; the most recent was 4 East Road, at €424,000 in July 2026.
East Road sales since 2010
Dashed line: two-year rolling median. Non-market sales and VAT-exclusive new-build prices excluded.
About East Road
East Road has terraced and end-of-terrace houses, mostly with two bedrooms, though some have four. Sizes run from 60 to 95 m². Several homes are well presented or fully renovated, and one has a double-storey side extension. Off-street parking is a feature of some houses.
East Road is a short walk from East Wall village, Fairview Park and the shops, cafes and restaurants on Church Road, with Lidl and Aldi supermarkets on East Wall Road. Dublin City Centre, the 3Arena, North Wall Quay, the IFSC and Grand Canal Dock are close by. Bus and DART services, the Luas red line and Connolly Station serve the area, and the Port Tunnel, East Link Bridge and Dublin Airport are easily reached by car.
For sale on East Road now
Every recorded sale
Homes for sale or sale agreed now are shown first.
| Address | Date | Asking | Sold | vs asking |
|---|---|---|---|---|
| 2 East Road4 bed · 95 m² · BER B3 | Sale agreedListed Nov 2025 | €525,000 | Awaiting register | |
| 4 East Road2 bed · 60 m² | 22 Jul 2026 | €375,000 | €424,000 | +13.1% |
| 86 East Road2 bed | 6 Jan 2025 | €220,000 | €264,000 | +20.0% |
| Flat 50, 55-58 East Road | 14 Oct 2020 | — | €350,000 | |
| Flat 67, 55-58 East Road | 7 May 2020 | — | €345,000 | |
| 6 East Road | 17 Jan 2020 | — | €340,000 | |
| 8 East Road | 22 Mar 2019 | — | €325,000 | |
| Flat 1, 55-58 East Roadnew build, ex-VAT | 11 Oct 2017 | — | €10,132,159 | |
| 92 East Road | 15 Jul 2017 | — | €142,500 | |
| 24 East Road | 2 Aug 2016 | — | €220,000 | |
| 10 East Road | 8 Jun 2016 | — | €195,000 | |
| 80 East Road | 2 Dec 2014 | — | €217,500 | |
| Flat 67, 55-58 East Road | 27 Nov 2014 | — | €225,000 | |
| 4 East Road2 bed · 60 m² · not full market price | 17 Dec 2013 | — | €48,125 | |
| 88 East Road | 8 Feb 2013 | — | €115,000 | |
| 6 East Road | 10 Oct 2012 | — | €130,000 | |
| 82 East Road | 11 Jan 2011 | — | €165,000 |
Planning applications on East Road
5 applications on record, newest first.
- Granted5B East Road, East Wall, Dublin 3
At ground floor level, change of use from an existing retail unit to 2no. 2-bedroom apartments with communal open space and a single storey extension to the rear and associated internal alterations and external elevational treatments to the rear and on East Road, at 5b East Road, East Wall, Dublin 3.more…
At ground floor level, change of use from an existing retail unit to 2no. 2-bedroom apartments with communal open space and a single storey extension to the rear and associated internal alterations and external elevational treatments to the rear and on East Road, at 5b East Road, East Wall, Dublin 3.
- GrantedMarshall Yards, 1-4 East Road, Dublin 3
The proposed development consists of minor amendments to the permitted and under construction Marshall Yards Development, as permitted under ABP-304710-19. The proposed amendments relate to the ground floor units, podium car parks and plant areas and not relating to any residential unit. The proposed amendments include: 1.Amendments to the permitted Ground Floor of the Northern Podium (below Blocks A1, A2, A3, B1, E1 & E2) as follows: •Revisions to car park to include revised access route to apartment stair cores, access to bin stores, rearrangement of plant rooms, fire rated enclosure to electric scooter storage to meet fire certificate compliance. This results in an additional 1 no. car parking space in the northern podium bringing total to 164 no. spaces (inc. 2 car club and 6 accessible spaces). •Amendment to permitted access doors, below Block A1, to East Road frontage to include for recessed entrance doors to meet DAC compliance. •Amalgamation and change of use of units (identified as Office Units 1 & 2) of permitted commercial units to Tenant Management Office & Co-Working Space of 217 sq.m. •Removal of unused comms room and external plantroom. •Change of use of unit (identified as Office 5) from permitted commercial space to a tenant amenity space to accommodate a gym of 202.9 sq.m. •Use of previously identified mechanical plant room below Block A1 as staff facilities including, a kitchenette, locker room, accessible bathroom and accessible shower room. •Subsequent revisions to external facade doorways on the southern elevation of the Northern Podium as a result of the above changes. 2.Amendments to the permitted Ground Floor of the Southern Podium (below Blocks D1, D2, B2, C1 & C2) as follows: •Relocation of access stair route to podium level of Blocks D1/D2 and C2. •Relocation of permitted ESB Substation, meters and switch room from ground floor of Block D1 to ground floor of Block C2 and replacement with dry good store related to food hub unit and addition of additional ESB substation and switch room under podium between Block C1 and B2 resulting in a minor reduction in the floorspace of permitted office space. •Amendments to car park to include fire rated enclosure provided from electric scooter storage and charging, rearrangement of plant room below Block D1/D2, addition of wet riser room below Block D2 for fire certificate compliance. The addition of the wet riser room has resulted in the removal of some bike parking at this location however this has been accommodated in other locations so there is no reduction in permitted cycle parking provision. •Removal of unused comms room resulting in a minor increase in the tenant amenity space below Block C2. •The reconfiguration of the internal podium layout results in the loss of 5 no. car parking spaces bringing the total in the southern podium to 66 no. spaces (inc. 5 accessible spaces). •Subsequent revisions to external facade doorways on the southern elevation of the Northern Podium as a result of the above changes. The above minor amendments have resulted in some alteration to permitted floor areas in the ground floor units however there is no increase in overall permitted floor area.more…
The proposed development consists of minor amendments to the permitted and under construction Marshall Yards Development, as permitted under ABP-304710-19. The proposed amendments relate to the ground floor units, podium car parks and plant areas and not relating to any residential unit. The proposed amendments include: 1.Amendments to the permitted Ground Floor of the Northern Podium (below Blocks A1, A2, A3, B1, E1 & E2) as follows: •Revisions to car park to include revised access route to apartment stair cores, access to bin stores, rearrangement of plant rooms, fire rated enclosure to electric scooter storage to meet fire certificate compliance. This results in an additional 1 no. car parking space in the northern podium bringing total to 164 no. spaces (inc. 2 car club and 6 accessible spaces). •Amendment to permitted access doors, below Block A1, to East Road frontage to include for recessed entrance doors to meet DAC compliance. •Amalgamation and change of use of units (identified as Office Units 1 & 2) of permitted commercial units to Tenant Management Office & Co-Working Space of 217 sq.m. •Removal of unused comms room and external plantroom. •Change of use of unit (identified as Office 5) from permitted commercial space to a tenant amenity space to accommodate a gym of 202.9 sq.m. •Use of previously identified mechanical plant room below Block A1 as staff facilities including, a kitchenette, locker room, accessible bathroom and accessible shower room. •Subsequent revisions to external facade doorways on the southern elevation of the Northern Podium as a result of the above changes. 2.Amendments to the permitted Ground Floor of the Southern Podium (below Blocks D1, D2, B2, C1 & C2) as follows: •Relocation of access stair route to podium level of Blocks D1/D2 and C2. •Relocation of permitted ESB Substation, meters and switch room from ground floor of Block D1 to ground floor of Block C2 and replacement with dry good store related to food hub unit and addition of additional ESB substation and switch room under podium between Block C1 and B2 resulting in a minor reduction in the floorspace of permitted office space. •Amendments to car park to include fire rated enclosure provided from electric scooter storage and charging, rearrangement of plant room below Block D1/D2, addition of wet riser room below Block D2 for fire certificate compliance. The addition of the wet riser room has resulted in the removal of some bike parking at this location however this has been accommodated in other locations so there is no reduction in permitted cycle parking provision. •Removal of unused comms room resulting in a minor increase in the tenant amenity space below Block C2. •The reconfiguration of the internal podium layout results in the loss of 5 no. car parking spaces bringing the total in the southern podium to 66 no. spaces (inc. 5 accessible spaces). •Subsequent revisions to external facade doorways on the southern elevation of the Northern Podium as a result of the above changes. The above minor amendments have resulted in some alteration to permitted floor areas in the ground floor units however there is no increase in overall permitted floor area.
- Granted68-72, East Road, Dublin 3
The development will consist of the construction of a 106 bedroom hotel ranging in height from 1 to 8 storeys over basement. The hotel will comprise of 3 main blocks (4-8 storeys) which are connected at ground floor level. The hotel will accommodate: • Reception/foyer, restaurant/café/bar, outdoor terrace, kitchen, toilets, meeting rooms, ancillary offices, plant and substation at ground floor; • Bedrooms at first to seventh floor levels; • Staff facilities, bicycle storage, refuse store, laundry, storage and plant at basement level; • Landscaping, plant at roof level and all associated signage, site works and services.more…
The development will consist of the construction of a 106 bedroom hotel ranging in height from 1 to 8 storeys over basement. The hotel will comprise of 3 main blocks (4-8 storeys) which are connected at ground floor level. The hotel will accommodate: • Reception/foyer, restaurant/café/bar, outdoor terrace, kitchen, toilets, meeting rooms, ancillary offices, plant and substation at ground floor; • Bedrooms at first to seventh floor levels; • Staff facilities, bicycle storage, refuse store, laundry, storage and plant at basement level; • Landscaping, plant at roof level and all associated signage, site works and services.
Appeal decision: Grant permission
- GrantedSeabank House, East Road, Dublin 3
Planning permission for the change of use at first floor level from an existing licensed premises to residential accommodation comprising 4no. 1 bedroomed and 1no. 2 bedroom apartments and change of use of second floor level office to residential accommodation comprising 4no. 1 bedroomed apartments plus communal roof garden at Seabank House, Eastwall Road, Dublin 3. Permission is also sought for revisions to the elevation facing East Road, to include new windows at first and second floor level, new entrance and windows at ground floor level and removal of the existing stair tower.more…
Planning permission for the change of use at first floor level from an existing licensed premises to residential accommodation comprising 4no. 1 bedroomed and 1no. 2 bedroom apartments and change of use of second floor level office to residential accommodation comprising 4no. 1 bedroomed apartments plus communal roof garden at Seabank House, Eastwall Road, Dublin 3. Permission is also sought for revisions to the elevation facing East Road, to include new windows at first and second floor level, new entrance and windows at ground floor level and removal of the existing stair tower.
Appeal decision: Grant permission
- Application declared28 - 30 East Road
construct 3 new terr…
Homes on East Road
Every address with a sale or listing on record.