Sold prices · Clondalkin, Dublin 22

Cappaghmore, Clondalkin: sold prices

There are 35 recorded sales on Cappaghmore since 2010. Homes have sold for a median of €460,000 since January 2023, across 7 open-market sales; the most recent was 168 Cappaghmore, at €485,000 in September 2026.

€460k
Median sale, 2023 – now
€3,963
Median € per m²
+10.4%
Median sold vs asking, 4 sales
3
For sale or sale agreed
Price paid, every open-market sale

Cappaghmore sales since 2010

€100k€200k€300k€400k€500k201020132016201920222025

Dashed line: two-year rolling median. Non-market sales and VAT-exclusive new-build prices excluded.

About the area

About Cappaghmore

Cappaghmore is an estate of semi-detached houses, most with four bedrooms and some with three, ranging from about 115 to 137 m². Most are well presented, and one has been fully renovated while another needs updating. Several have been extended, often to the side or rear, and a few have converted garages or a converted attic.

Cappaghmore is a short walk from Clondalkin Village, with the Ninth Lock and the Waterside Bistro nearby. The Mill Shopping Centre, local primary and secondary schools, sports clubs and leisure facilities are close by. Direct bus routes serve Dublin City Centre, and the Red Cow Luas stop and the M50 are within easy reach.

On the market

For sale on Cappaghmore now

Property Price Register · asking vs sold

Every recorded sale

Homes for sale or sale agreed now are shown first.

AddressDateAskingSoldvs asking
68 Cappaghmore4 bed · 135 m² · BER D1For saleListed Sep 2026€495,000—
149 Cappaghmore3 bed · 137 m² · BER E1For saleListed Jul 2026€575,000—
17 Cappaghmore4 bed · 127 m² · BER E2For saleListed Apr 2026€400,000—
168 Cappaghmore4 bed · 123 m²11 Sep 2026€445,000€485,000+9.0%
88 Cappaghmore4 bed · 123 m²19 May 2026€435,000€490,000+12.6%
146 Cappaghmorenot full market price27 Jan 2026—€212,500
153 Cappaghmorenot full market price29 Aug 2025—€270,000
108 Cappaghmore 14 Apr 2025—€425,000
113 Cappaghmore4 bed · 115 m²5 Nov 2024€425,000€475,000+11.8%
58A Cappaghmorenot full market price5 Sep 2024—€200,000
165 Cappaghmore4 bed · 140 m²9 Jul 2024€430,000€460,000+7.0%
77 Cappaghmore 7 Jul 2023—€435,000
27 Cappaghmore 16 Feb 2023—€405,000
11 Cappaghmore 19 Oct 2022—€430,000
72 Cappaghmore 26 May 2022—€380,000
99 Cappaghmore 25 Mar 2022—€460,000
170 Cappaghmore 30 Jul 2021—€457,000
24 Cappaghmore 2 Oct 2020—€332,500
90 Cappaghmore 5 May 2020—€310,000
39 Cappaghmore 30 Jul 2019—€334,000
139 Cappaghmore 1 Jul 2019—€344,000
117 Cappaghmore 19 Jun 2018—€355,000
171 Cappaghmore 17 Jan 2018—€318,000
8 Cappaghmore 14 Sep 2017—€340,000
75 Cappaghmore 13 Jul 2017—€327,200
146 Cappaghmore 21 Dec 2016—€335,000
98 Cappaghmore 7 Oct 2015—€340,000
89 Cappaghmore 31 Mar 2015—€268,500
86 Cappaghmore 26 Sep 2014—€297,500
68 Cappaghmore4 bed · 135 m²22 May 2013—€285,000
145 Cappaghmore 17 May 2013—€265,000
172A Cappaghmore 23 Apr 2013—€160,000
123 Cappaghmore 10 Oct 2012—€262,500
52 Cappaghmore 24 Aug 2012—€255,000
129 Cappaghmore 25 Jun 2012—€205,000
77 Cappaghmore 5 Apr 2012—€210,000
6 Cappaghmore 20 Jan 2012—€220,000
14 Cappaghmore 21 Oct 2011—€250,000
104 Cappaghmore 23 Mar 2011—€290,000
58C Cappaghmore 15 Oct 2010—€230,000
56 Cappaghmore 27 Jul 2010—€295,000
Planning register

Planning applications on Cappaghmore

The latest 12 of 40 applications on record, newest first.

  • Granted20 Nov 2025 · South Dublin ref. SD25B/0651W
    58C Cappaghmore
    The development consists of a two-storey extension to the side, a single-storey extension to the rear, a rear dormer roof, and necessary ancillary work to facilitate the development.more…

    The development consists of a two-storey extension to the side, a single-storey extension to the rear, a rear dormer roof, and necessary ancillary work to facilitate the development.

  • Granted20 Feb 2025 · South Dublin ref. SD25B/0079
    149 Cappaghmore
    Alterations to the previously approved SD24B/0131. A first floor extension to the Front side and rear over the existing Converted Garage. Alterations to the existing hipped roof and the roof be extended over the proposed extension. With conversion of the enlarged Attic and Dormer window to the rearmore…

    Alterations to the previously approved SD24B/0131. A first floor extension to the Front side and rear over the existing Converted Garage. Alterations to the existing hipped roof and the roof be extended over the proposed extension. With conversion of the enlarged Attic and Dormer window to the rear

  • Granted3 Jul 2024 · South Dublin ref. SD24B/0307W
    42, Cappaghmore, Clondalkin, Dublin 22, D22 V4H3

    Proposed porch extension and garage conversion with tiled roof.

  • Granted18 Oct 2023 · South Dublin ref. SD23B/0446
    135, Cappaghmore, Cappagh, Dublin 22, D22 H3F9
    Demolition of existing 7.15 sq/m ground floor rear extension, change of use of 10.8 sq/m garage to habitable space; construction of an 18 sq/m first floor side extension; construction of a 33.2 sq/m ground floor rear extension; construction of a 2.3 sq/m porch to the front of existing dwelling and conversion of attic space to storage room.more…

    Demolition of existing 7.15 sq/m ground floor rear extension, change of use of 10.8 sq/m garage to habitable space; construction of an 18 sq/m first floor side extension; construction of a 33.2 sq/m ground floor rear extension; construction of a 2.3 sq/m porch to the front of existing dwelling and conversion of attic space to storage room.

  • Granted4 Aug 2023 · South Dublin ref. SD23A/0183
    58, Cappaghmore, Clondalkin, Dublin 22.
    To change condition No. 4 of Planning Application SD20A/0062 to increase the number of children attending any one session from 16 to 20more…

    To change condition No. 4 of Planning Application SD20A/0062 to increase the number of children attending any one session from 16 to 20

  • Granted28 Apr 2023 · South Dublin ref. SD23B/0005
    28, Cappaghmore, Cappagh, Dublin 22
    2 storey extension to side. Rear attic storage with dormer window to rear. Roof window to the front. Garage conversion for extended living.more…

    2 storey extension to side. Rear attic storage with dormer window to rear. Roof window to the front. Garage conversion for extended living.

  • Request additional information22 Feb 2023 · South Dublin ref. ED23/0004
    94/95, Cappaghmore, Clondalkin, Dublin 22
    Erection of gate pillars in front garden of building in excess of 1.2 mt highmore…

    Erection of gate pillars in front garden of building in excess of 1.2 mt high

  • Granted2 Sep 2021 · South Dublin ref. SD21B/0365
    14 Cappaghmore
    Conversion of attic to storage including changing existing hipped end roof to a gable end roof; dormer window to the rear and a window to the new side gable wall, all at roof level.more…

    Conversion of attic to storage including changing existing hipped end roof to a gable end roof; dormer window to the rear and a window to the new side gable wall, all at roof level.

  • Declared exempt8 Apr 2021 · South Dublin ref. ED21/0028
    94/95, Cappaghmore, Clondalkin, Dublin 22
    Former nursing home comprised of two dwellings converted to a homeless hub for families.more…

    Former nursing home comprised of two dwellings converted to a homeless hub for families.

  • Extension of time granted9 Feb 2021 · South Dublin ref. SD16A/0278/EP
    94-95, Cappaghmore, Clondalkin, Dublin 22.
    Amendments to previous grant of permission SD14A/0157. Change of use of part first floor plan to create 2 addtional bedrooms, alterations and refurbishment of existing nursing home and all associated site works.more…

    Amendments to previous grant of permission SD14A/0157. Change of use of part first floor plan to create 2 addtional bedrooms, alterations and refurbishment of existing nursing home and all associated site works.

  • Granted4 Mar 2020 · South Dublin ref. SD20A/0062
    58, Cappaghmore, Clondalkin, Dublin 22.
    Revision of previously approved planning SD09A/0313 including increase the number of children attending the playschool to 16 (maximum) in any one session; change opening hours to 9am - 12pm (morning session) and 12:30pm - 3:30pm (afternoon session), Monday to Friday; minor internal changes to the playschool; all associated site works.more…

    Revision of previously approved planning SD09A/0313 including increase the number of children attending the playschool to 16 (maximum) in any one session; change opening hours to 9am - 12pm (morning session) and 12:30pm - 3:30pm (afternoon session), Monday to Friday; minor internal changes to the playschool; all associated site works.

  • Granted23 May 2019 · South Dublin ref. SD19B/0207
    29, Cappaghmore, Clondalkin, Dublin 22
    First floor extension to side over converted garage, with projecting bay window to rear; ground floor extension to front incorporating porch and extended living and play rooms; attic conversion to utility/storage incorporating 'Velux' type rooflights to all aspects with solar panels to rear; external insulation to all elevations; demolition of garden shed replacing with new shed; all associated site works and drainage.more…

    First floor extension to side over converted garage, with projecting bay window to rear; ground floor extension to front incorporating porch and extended living and play rooms; attic conversion to utility/storage incorporating 'Velux' type rooflights to all aspects with solar panels to rear; external insulation to all elevations; demolition of garden shed replacing with new shed; all associated site works and drainage.

House by house

Homes on Cappaghmore

Every address with a sale or listing on record.

Sold since 2023For sale or sale agreedEarlier sale or listing